How to win construction tenders: a guide for SME contractors
A practical guide for UK SME contractors to finding, choosing and winning construction tenders under the Procurement Act 2023, from Find a Tender and pre-qualification to quality answers, pricing, social value and feedback.
Tendering can feel like a game the big firms already know how to play. The documents are long, the portals are clunky, and you can spend three evenings on a bid only to get a one-line rejection.
Yet plenty of small and medium contractors do win public and main-contractor work regularly. In our experience, the difference isn’t that they write better prose. It’s that they bid for fewer, better-matched jobs, have their paperwork ready before the tender lands, and answer the question the buyer actually asked.
This guide covers how tendering works in the UK now, where to find the right opportunities, how to decide which to go for, and how to put together a bid that scores.
The UK public procurement rules have changed
If you last tendered for public work a couple of years ago, a lot has moved.
The Procurement Act 2023 came into force on 24 February 2025. Procurements started before that date still run under the old rules (mainly the Public Contracts Regulations 2015) until they finish. Anything new is under the Act.
The main changes that affect you:
- One place to find opportunities. Find a Tender is now the central digital platform for public sector notices. Government guidance says new below-threshold opportunities must be advertised on Find a Tender. Contracts Finder is still used for procurements that began under the old rules.
- Register once, bid many times. You store your core business details on Find a Tender and reuse them across bids. It’s free to use, and you only need to register when you want to bid.
- Better feedback. Public bodies must give suppliers who submitted an assessed tender an assessment summary, with scores and reasons.
- Faster payment. Government says the Act extends 30-day payment terms to a broader range of public sector contracts.
PQQ, SQ, PSQ: what’s it called now?
Contractors still say “PQQ”, and you’ll still see it in private sector tenders. In public procurement, the names have changed twice.
- Under the old regulations, central government used the Standard Selection Questionnaire (SSQ or SQ) for pre-qualification.
- Under the Act, buyers set conditions of participation. These assess you as a supplier (your legal and financial capacity and technical ability), while the award criteria assess your tender. The Act doesn’t require a set format, so buyers can use their own templates.
- Government has published a template called the Procurement Specific Questionnaire (PSQ), which fulfils a similar role to the old SQ. It pulls your core details from Find a Tender and adds questions on exclusions and conditions of participation.
- For works contracts, buyers can still use industry questionnaires such as the Common Assessment Standard (CAS), as long as they meet the Act’s rules.
Whatever it’s called, the job is the same: prove you’re a safe, capable, financially sound business before anyone reads your price.
Rules that help smaller firms
The Act’s guidance on conditions of participation includes some points worth knowing:
- A buyer can’t require insurance to be in place before award. It can ask for evidence that you’ll have the required insurance when the contract starts.
- A buyer can’t demand audited accounts if your business isn’t legally required to have them audited. It has to look at other evidence.
- A buyer can’t require a particular qualification without accepting equivalents.
Thresholds
Thresholds decide which rules apply. From 1 January 2026, the threshold for most works contracts is £5,193,000, and threshold values include VAT.
Most SME construction work falls below that, which is good news. For below-threshold contracts, government guidance says:
- contracts worth £12,000 or more (central government) or £30,000 or more (other public bodies), including VAT, must be published if they are advertised
- buyers can restrict below-threshold competitions to SMEs
- buyers generally can’t run a separate pre-qualification stage for below-threshold contracts. They can still check suitability at award. The exception is higher-value below-threshold works contracts, where a separate suitability stage is allowed
Scotland, Wales and Northern Ireland
- Scotland. Devolved Scottish public bodies are generally outside the Act, and Scottish procurement law still applies to them. Scottish public bodies must use Public Contracts Scotland as their main tool for advertising regulated contracts. It’s free for suppliers.
- Wales. Devolved Welsh authorities are covered by the Act, with some differences. They publish notices through Sell2Wales, which feeds into Find a Tender.
- Northern Ireland. Transferred Northern Ireland authorities are covered by the Act, with some differences in the rules.
Where to find construction tenders
Public sector
- Find a Tender. The central digital platform is free to search, and you can set up alerts for the work you want.
- Pipeline notices. Public bodies that spend more than £100 million a year must publish pipeline notices on Find a Tender for contracts over £2 million expected in the next 18 months. Even if you won’t bid as the main contractor, they show you which projects are coming and who might need subcontractors.
- Public Contracts Scotland and Sell2Wales, if you work in Scotland or Wales.
- Council and housing association portals. Many buyers run their own e-tendering portals as well, so register with the ones in your area.
Private sector and main contractors
Most SME contractors win more work from main contractors than directly from public bodies. Main contractors run their own supply chain processes, usually with a pre-qualification questionnaire and a preferred supplier list.
- Get on the approved lists of the main contractors working in your area. Ask their supply chain or procurement team how to apply.
- Hold the accreditation they use. In our experience, many use an SSIP scheme or CAS through bodies such as CHAS or Constructionline. Our guide to construction accreditations explains which to get first.
- Use buyer platforms. Constructionline’s membership, for example, includes a Marketplace where main contractors send early access invitations to tender.
- Watch who’s winning. When a main contractor wins a public contract near you, it will need subcontractors. Public Contracts Scotland, for example, lets prime contractors advertise sub-contract opportunities.
Deciding which tenders to bid for
The quickest way to improve your win rate is to stop bidding for jobs you were never going to win. Before you open the documents properly, run a quick bid/no-bid check. As a rule of thumb, if you can’t say yes to most of these, walk away:
| Question | What you’re checking |
|---|---|
| Have we done this type of work, at this size, recently? | You’ll need case studies and references |
| Do we meet every pass/fail condition? | Accreditations, insurance levels, turnover, experience |
| Is the value right for us? | Too small wastes bid time, too big stretches cash flow and capacity |
| Can we resource it when they want it? | Labour, supervision, plant, and your other commitments |
| Do we know the client, or can we find out what they care about? | Bids written blind score lower |
| Can we make a margin at a price that could win? | If the only way to win is at cost, it isn’t a win |
| Do we have time to write a good bid? | A rushed bid is usually a wasted bid |
Keep a simple log of every tender: whether you bid, your score, the winner’s score if you know it, and why you won or lost. After a year, you’ll know your sweet spot.
Get your pre-qualification ready before the tender lands
Pre-qualification is usually pass or fail. You can’t write your way past a missing certificate, so have a bid library ready:
- company details, registration numbers and your Find a Tender registration for public work
- health and safety policy, signed and dated, plus your SSIP or CAS certificate
- insurance certificates (employer’s liability, public liability, and professional indemnity if you do design)
- accounts for the last two or three years, or other financial evidence if yours aren’t audited
- quality, environmental, equality and modern slavery policies where they apply
- three to five recent references, with permission from the clients
- CVs for your key people
- three or four strong case studies (more on these below)
Update it every quarter. In our experience, this one habit saves more bid time than anything else.
Writing a quality response that scores
The quality section is where SMEs can beat bigger firms. Evaluators score what’s on the page against set criteria, not your reputation.
Read the scoring first
Find the evaluation criteria and the scoring guide. Note the weighting of each question and the word limit. Spend your time in proportion: a question worth 20% deserves far more effort than one worth 5%.
Answer the question they asked
Break each question into its parts and answer each part, in order, using their words as your subheadings. Evaluators work through a checklist. Make their job easy.
Be specific to this project
Generic answers score low. Instead of “we take health and safety seriously”, say how you’ll manage this site: access, neighbours, live areas, deliveries, the named supervisor and what they do each day.
A simple structure that works for most questions:
- What you’ll do, specific to this contract.
- How you’ll do it: the process, the people, the tools.
- Proof: a short example from a similar job, with an outcome you can stand behind.
- What the client gets: why it reduces their risk or saves them time.
Use evidence, not adjectives
Replace “experienced team” with names, roles and years. Replace “excellent track record” with a short case study and a reference. If you claim something, prove it.
Check before you submit
- Every question answered, within the word limit
- Every required document attached, in the right format
- Pricing schedule complete, with no blank lines
- Someone who didn’t write it has read it
- Submitted well before the deadline, in case the portal is slow or your upload fails
Pricing to win and still make money
Price matters, but it’s rarely the only thing being scored. Read how price is scored. Some methods compare you to the lowest bid. Others compare price against quality.
- Price what’s in the documents. If the specification is unclear, ask a clarification question before the deadline. Everyone sees the answer, which keeps the field level.
- Don’t buy the work. Under the Act, a buyer can disregard a tender it considers abnormally low, although it must first give you a chance to show you can deliver at that price. More importantly, a job won at a loss can hurt your cash flow for months.
- Think about cash flow. Check the payment terms, retention and how often you can apply for payment. On public contracts covered by the Act, government says 30-day payment terms now apply more widely.
- Show your assumptions. If the tender allows it, list what’s included and excluded so your price can’t be misread.
Social value
Social value is now a scored part of many public tenders.
For central government buyers, PPN 002 requires a minimum 10% weighting for social value on above-threshold procurements under the Act that started on or after 1 October 2025. It applies to central government departments, executive agencies and non-departmental public bodies. Councils and other public bodies aren’t bound by it but may follow the same approach, so check each tender’s criteria.
What scores well, as a rule of thumb, is the same as everywhere else in a bid: specific, measurable and relevant to this contract. For an SME, that might be:
- hiring or training local people on the job, with numbers you can commit to
- using local subcontractors and suppliers
- work experience or site visits for a local school or college
- reducing waste and vehicle movements on this site
Only commit to what you can deliver and report on. The buyer may hold you to it.
Feedback and debriefs
Every bid, won or lost, should make the next one better.
Public sector
Under the Act, buyers must give an assessment summary to every supplier that submitted an assessed tender. It includes your score for each criterion with reasons. If you lost, you also get the winning supplier’s scoring information, redacted where needed. Comparing the two shows you exactly where you dropped marks.
After the contract award notice is published, there’s a standstill period of at least eight working days before the contract can be signed. That’s the window to raise concerns about the decision, so read your summary straight away.
Private sector
Main contractors don’t have to give feedback, but in our experience most will if you ask politely. Ring the buyer, thank them, and ask two questions: where did we lose marks, and what would have made the difference?
Turn feedback into actions
Add every piece of feedback to your bid log. If you lose marks on the same question twice, rewrite that section of your bid library before the next tender.
Build case studies that win the next one
Strong case studies are the most reusable thing in your bid library. A good construction case study is short and covers:
- the client and the type of building
- value, duration and your role (main contractor, subcontractor, design and build)
- the challenge: a live site, tight access, a programme squeeze, a heritage building
- what you did about it
- the result, in terms you can evidence: handed over on time, zero reportable accidents, client reference available
- before, during and after photos
Ask for permission to name the client, and keep a reference contact for each. Our guide to construction case studies and photography covers how to capture these as you go, rather than scrambling for them on deadline day.
The same case studies belong on your website. In our experience, buyers and main contractors often look you up before they shortlist, and a site that shows recent, relevant projects backs up everything in your bid.
Common questions
When did the Procurement Act 2023 come into force?
The Act came into force on 24 February 2025. Procurements that started before then continue under the old rules, mainly the Public Contracts Regulations 2015, until they finish.
Is Contracts Finder still used?
Yes, but only for procurements that began under the old regulations. Government guidance says new below-threshold opportunities under the Act must be advertised on Find a Tender.
Do I still need to fill in a PQQ?
Often, yes, though it may be called something else. Under the Act, public buyers set conditions of participation and may use the Procurement Specific Questionnaire or, for works, the Common Assessment Standard. Main contractors still use their own PQQs.
What is tender writing and should I outsource it?
Tender writing is preparing the written answers that are scored in a bid. You can outsource it, but the evidence, case studies and site knowledge have to come from you. In our experience, a good bid writer makes a strong contractor score better. It can’t make a poor fit win.
How many tenders should a small contractor bid for?
There’s no right number. As a rule of thumb, bid for fewer, better-matched jobs and do each one properly, rather than spreading your time thin. Track your win rate and adjust.
Where to go next
Winning tenders is easier when buyers can see your work before they read your bid. Our construction hub brings together everything Veon Media does for construction firms, including construction website design that shows off your projects properly.
Prices and platform terms checked on 29 October 2026. They change, so check before you commit.